| Article ID: | iaor1999125 |
| Country: | United States |
| Volume: | 29 |
| Issue: | 6 |
| Start Page Number: | 451 |
| End Page Number: | 457 |
| Publication Date: | Jun 1997 |
| Journal: | IIE Transactions |
| Authors: | Prabhu Sharad S., Runger George C., Montgomery Douglas C. |
| Keywords: | control |
The design of a CUSUM control chart typically involves choosing the subgroup size and sampling interval to achieve specified control chart performance. One can maintain a specified sampling intensity by using small subgroups at frequent intervals or larger subgroups at infrequent intervals. We use the average time to signal to investigate the performance of a CUSUM chart under alternative selections of the subgroup size and sampling interval. Recommendations are provided for both initial-state and steady-state performance.