Article ID: | iaor1999125 |
Country: | United States |
Volume: | 29 |
Issue: | 6 |
Start Page Number: | 451 |
End Page Number: | 457 |
Publication Date: | Jun 1997 |
Journal: | IIE Transactions |
Authors: | Prabhu Sharad S., Runger George C., Montgomery Douglas C. |
Keywords: | control |
The design of a CUSUM control chart typically involves choosing the subgroup size and sampling interval to achieve specified control chart performance. One can maintain a specified sampling intensity by using small subgroups at frequent intervals or larger subgroups at infrequent intervals. We use the average time to signal to investigate the performance of a CUSUM chart under alternative selections of the subgroup size and sampling interval. Recommendations are provided for both initial-state and steady-state performance.