Solution methods for material requirement planning with lot-size dependent lead times

Solution methods for material requirement planning with lot-size dependent lead times

0.00 Avg rating0 Votes
Article ID: iaor19982176
Country: Netherlands
Volume: 76
Issue: 1
Start Page Number: 201
End Page Number: 217
Publication Date: Feb 1998
Journal: Annals of Operations Research
Authors: ,
Keywords: programming: dynamic, programming: integer
Abstract:

A mixed zero–one programming model of an MRP lot-sizing problem whose lead times are dependent on lot sizes is considered. The algorithm is tested under different randomly generated parameter values and computerized results are presented.