Article ID: | iaor19981139 |
Country: | Netherlands |
Volume: | 80 |
Issue: | 1 |
Start Page Number: | 121 |
End Page Number: | 129 |
Publication Date: | Jan 1995 |
Journal: | European Journal of Operational Research |
Authors: | Maimon O., Dayagi A. |
Keywords: | programming: multiple criteria |
The purpose and contribution of this work is in developing a methodology for integrating nesting technology with production priorities. Production priorities are based on a due-date (e.g. from an MRP-II program) and other management factors. A good nesting plan requires high raw material utilization. Economic operation demands low set-up frequency between nesting plans. These three factors usually conflict. We present here a parametric multi-objective mathematical programming formulation that takes account of these factors and their tradeoffs, and suggests an optimal solution to the problem.