| Article ID: | iaor19971144 |
| Country: | Netherlands |
| Volume: | 18 |
| Issue: | 1 |
| Start Page Number: | 41 |
| End Page Number: | 47 |
| Publication Date: | Aug 1995 |
| Journal: | Operations Research Letters |
| Authors: | Tien James M., Li Wei |
| Keywords: | production, statistics: inference |
Nozari and Whitt proposed an indirect approach to estimating the average production interval (i.e., the length of time between starting and finishing work on each good or defect-free product), based on measurements of the work-in-process inventory and the production rate. A necessary and sufficient conditon for the consistency or validity of their estimator is derived herein. The present validity condition also yields an alternate estimator for the average production interval; as a direct estimator, it has better asymptotic efficiency than the indirect estimator.