Article ID: | iaor1997609 |
Country: | Netherlands |
Volume: | 26 |
Issue: | 3 |
Start Page Number: | 159 |
End Page Number: | 170 |
Publication Date: | Jun 1996 |
Journal: | Engineering Optimization |
Authors: | Hwang Hark, Ree Paek |
Keywords: | production, planning |
This paper proposes a two stage procedure for the cell formation problem with alternative processing routes. Previously, Kusiak provided the generalized p-median model in which route selection and part family formation problems are solved simultaneously. In the proposed procedure, the two problems are solved separately whose objective functions are formulated based on different similarity measures. In the compatibility coefficient. The generated set of routes tends to result in a grouping solution with highly independent manufacturing cells. In the second stage, part families are formed using the p-median model. Computational results by the proposed procedure are presented and compared to those by the generalized p-median model.