| Article ID: | iaor1997506 |
| Country: | Netherlands |
| Volume: | 44 |
| Issue: | 1/2 |
| Start Page Number: | 53 |
| End Page Number: | 61 |
| Publication Date: | Jun 1996 |
| Journal: | International Journal of Production Economics |
| Authors: | Tsubone Hitoshi, Furuta Hirohsia |
| Keywords: | hierarchical structure |
In this paper the authors discuss the relationship between the timing for replanning and the buffer inventory in terms of system performance in a multistage production system, where there are multiple opportunities for replanning within the accumulated production lead time. Two performance measures are used: the unfilled rate for market demand and the rate of change in production quantity due to replanning. The results obtained through simulation study yield a basis for choosing a replanning rule.