Timetable construction with Markovian neural network

Timetable construction with Markovian neural network

0.00 Avg rating0 Votes
Article ID: iaor1997121
Country: Netherlands
Volume: 69
Issue: 1
Start Page Number: 92
End Page Number: 96
Publication Date: Aug 1993
Journal: European Journal of Operational Research
Authors:
Keywords: neural networks, markov processes
Abstract:

A neural network which efficiently and nearly optimally solves combinatorial optimization problems was applied to the timetable problem. The network was tested on a real-world timetable problem. The results indicate that the Markovian neural network is an efficient and flexible tool for solving real-world combinatorial optimization problems such as construction of a timetable for high schools.

Reviews

Required fields are marked *. Your email address will not be published.