A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks

A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks

0.00 Avg rating0 Votes
Article ID: iaor1996807
Country: United States
Volume: 35
Start Page Number: 73
End Page Number: 78
Publication Date: Aug 1994
Journal: Production and Inventory Management Journal
Authors:
Keywords: simulation: applications
Abstract:

A computer simulation was used to compare TOC, JIT, and traditional manufacturing systems. Four performance measures were considered: average WIP inventory, average flow time, standard deviation of flow time, and total system output.

Reviews

Required fields are marked *. Your email address will not be published.