Parts routing in a Flexible Manufacturing System with time-varying demands

Parts routing in a Flexible Manufacturing System with time-varying demands

0.00 Avg rating0 Votes
Article ID: iaor1996465
Country: Netherlands
Volume: 60
Issue: 2
Start Page Number: 224
End Page Number: 232
Publication Date: Jul 1992
Journal: European Journal of Operational Research
Authors: ,
Abstract:

In this paper, a heuristic algorithm for solving job scheduling/parts routing problems in an FMS with time-varying demands is presented. The algorithm is suitable for scheduling a small manufacturing system which processes contracted parts for outside companies or for a department which processes for other departments in the organization. Numerical examples are presented.

Reviews

Required fields are marked *. Your email address will not be published.