Article ID: | iaor19952044 |
Country: | United States |
Volume: | 7 |
Issue: | 3 |
Start Page Number: | 207 |
End Page Number: | 227 |
Publication Date: | Jul 1995 |
Journal: | International Journal of Flexible Manufacturing Systems |
Authors: | Andreatta G., Deserti L., Giraldo L.N. |
Keywords: | scheduling |
The flexible manufacturing system (FMS) considered in this paper is composed of two CNC machines working in series-a punching machine and a bending machine connected through rollers acting as a buffer system of finite capacity. The main difference between the present problem and the standard two-machine flow shop problem with finite intermediate capacity is precisely the buffer system, which in the present problem consists of two stacks of parts supported by rollers: the first stack contains the output of the punching machine, while the second stack contains the input for the bending machine. When the second stack is empty, the first stack may be moved over. Furthermore, the capacity of each stack depends on the particular part type being processed. The FMS can manufacture a wide range of parts of different types. Processing times on the two machines are usually different so that an unbalance results in their total workload. Furthermore, whenever there is a change of the part type in production, the machines must be properly reset-that is, some tools need to be changed or repositioned. A second important difference between the present problem and the usual two-machine flow shop problem is the objective. Given a list of