A comparative study of production and material planning techniques

A comparative study of production and material planning techniques

0.00 Avg rating0 Votes
Article ID: iaor1995899
Country: Australia
Volume: 13
Issue: 3
Start Page Number: 2
End Page Number: 7
Publication Date: Sep 1994
Journal: ASOR Bulletin
Authors:
Keywords: manufacturing industries, production: JIT, production: MRP
Abstract:

The problem of effective production and material planning has given rise to many techniques, including material requirements planning, manufacture resource planning, a variety of finite capacity scheduling methods and just in time. In this article, an objective function is proposed, which forms a basis for comparing different techniques, and a simulation study is reported in which various techniques are compared. The results favour due date scheduling with both capacity and materials constraints.

Reviews

Required fields are marked *. Your email address will not be published.