| Article ID: | iaor1995490 |
| Country: | Switzerland |
| Volume: | 50 |
| Issue: | 1 |
| Start Page Number: | 557 |
| End Page Number: | 574 |
| Publication Date: | Sep 1994 |
| Journal: | Annals of Operations Research |
| Authors: | De Souza Kleber X.S., Armentano Vincius A. |
| Keywords: | programming: integer |
Multi-item capacitated lot-sizing involves the determination of production quantities in different periods in the presence of resource constraints. The model presented in this paper includes a setup time for the production of a lot of an item. The production of items in a given period is constrained by a limited regular time and a limited overtime. Moreover, the production level of any item in a given period is also limited. This problem is tackled by a Cross decomposition based algorithm which can provide an optimal solution, or a near optimal solution if computational time is restricted.