| Article ID: | iaor1988996 |
| Country: | Belgium |
| Volume: | 30 |
| Start Page Number: | 169 |
| End Page Number: | 172 |
| Publication Date: | Jul 1988 |
| Journal: | Cahiers du Centre d'tudes de Recherche Oprationnelle |
| Authors: | Goyal S.K., Pal S.S. |
| Keywords: | production |
An algorithm is given for determining an optimal sequence for a number of jobs that are processed on three machines and when there are setup operations which can be performed without a job on the machine. A practical example is given to illustrate the algorithm.