Bounds for throughput in production/inventory systems in series with deterministic processing times

Bounds for throughput in production/inventory systems in series with deterministic processing times

0.00 Avg rating0 Votes
Article ID: iaor1988985
Country: United States
Volume: 21
Issue: 1
Start Page Number: 82
End Page Number: 85
Publication Date: Mar 1989
Journal: IIE Transactions
Authors: ,
Keywords: inventory, measurement
Abstract:

A production/inventory system consisting of work stations in series and a finished product warehouse is introduced. Bounds for the throughput are developed through the analysis of the reversed system of tandem queues. Examples are provided to show the bounds.

Reviews

Required fields are marked *. Your email address will not be published.