Coordinating production and transportation lotsizes

Coordinating production and transportation lotsizes

0.00 Avg rating0 Votes
Article ID: iaor19942277
Country: Germany
Volume: 16
Start Page Number: 9
End Page Number: 20
Publication Date: May 1994
Journal: OR Spektrum
Authors:
Keywords: lot sizing
Abstract:

An extension is introduced to the multi-stage stationary lot-sizing problem with finite production rates by the time-concentrated transportation-process. This representation adequately demonstrates the relations between supplier, carrier and producer. With regard to the reconciliation of the decision variables of these institutional units one differentiates between a pure simultaneous, a pure gradual and two mixed simultaneous-gradual coordination methods. The differences and correspondences of the respective decision variables and the resulting cost functions are demonstrated by means of an analytical examination. Finally, a numerical analysis shows the distinctions in total cost between the pure simultaneous and pure gradual coordination method.

Reviews

Required fields are marked *. Your email address will not be published.