An economic design of constant stress accelerated life tests

An economic design of constant stress accelerated life tests

0.00 Avg rating0 Votes
Article ID: iaor19942195
Country: South Korea
Volume: 19
Issue: 1
Start Page Number: 145
End Page Number: 152
Publication Date: Apr 1994
Journal: Journal of the Korean ORMS Society
Authors: ,
Abstract:

This paper deals with an economic design of accelerated life test under constant stresses where failure times are exponentially distributed. In this case, the optimization criterion is the information amount per unit cost. Fisher’s information matrix of the exponential distribution’s parameters and expected cost considering fixed and variable costs are obtained. The decision variable in this model is the censoring time. In the 2-level constant stress case, it is proved that the optimal solution exists and is unique under some condition. Numerical examplles are also included. [In Korean.]

Reviews

Required fields are marked *. Your email address will not be published.