Manpower capacity planning-A hierarchical approach

Manpower capacity planning-A hierarchical approach

0.00 Avg rating0 Votes
Article ID: iaor19941373
Country: Netherlands
Volume: 30/31
Start Page Number: 95
End Page Number: 106
Publication Date: Jul 1993
Journal: International Journal of Production Economics
Authors: ,
Keywords: programming: dynamic
Abstract:

Planning manpower capacity can be achieved by a large number of instruments. These instruments are particularly suited for long-, medium- and short-term planning. Within a case study, this paper demonstrates the simultaneous application of the following four instruments belonging to different planning levels: variation of monthly working time, overtime, employment of floaters, and leasing of work force. The optimization is performed by an ambitious stochastic dynamic program using modern concepts of hierarchical planning. For the indicated practical case mentioned above numerical results will be derived and extensively discussed.

Reviews

Required fields are marked *. Your email address will not be published.