Order-statistic calculation, costs, and service in an (s,Q) inventory system

Order-statistic calculation, costs, and service in an (s,Q) inventory system

0.00 Avg rating0 Votes
Article ID: iaor19941336
Country: United States
Volume: 41
Issue: 1
Start Page Number: 81
End Page Number: 97
Publication Date: Feb 1994
Journal: Naval Research Logistics
Authors: ,
Keywords: lead time
Abstract:

A retailer or distributor of finished goods, or the manager of a spare-parts inventory system, must generally forecast the major portion of demand. A specific customer-service level p (fraction of replenishment intervals with no stockout) implies two challenges: achieve the service within a small interval plus or minus, and do so with a minimum-cost investment in inventory. The pth fractile of lead-time demand (LTD) is the reorder point (ROP) for this service measure, and is often approximated by that fractile of a normal distribution. With this procedure, it is easy to set safety stocks for an (s,Q) inventory system. However, Bookbinder and Lordahl and others have identified cases where the normal approximation yields excessive costs and/or lower service than desired. This article employs an order-statistic approach. Using available LTD data, the ROP is simply estimated from one or two of the larger values in the sample. This approach is sufficiently automatic and intuitive for routine implementation in industry, yet is distribution free. The order-statistic method requires only a small amount of LTD data, and makes no assumptions on the form of the underlying LTD distribution, nor even its parameters μ and σ. The authors compare the order-statistic approach and the normal approximation, first in terms of customer service and then using a model of expected annual cost. Based upon characteristics of the available LTD data, they suggest a procedure to aid a practitioner in choosing between the normal and order-statistic method.

Reviews