Article ID: | iaor19941334 |
Country: | Switzerland |
Volume: | 48 |
Issue: | 1/4 |
Start Page Number: | 381 |
End Page Number: | 400 |
Publication Date: | Jan 1994 |
Journal: | Annals of Operations Research |
Authors: | Altiok T., Baykal-Grsoy M., Danhong H. |
The authors consider a two-stage, pull-type production/inventory system with a known service mechanism at the first stage. Set-ups and start-ups are involved in the operation of the second stage. The authors develop a production control policy for the second stage, within the class of (