Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules

Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules

0.00 Avg rating0 Votes
Article ID: iaor1994963
Country: United States
Volume: 5
Issue: 4
Start Page Number: 301
End Page Number: 323
Publication Date: Sep 1993
Journal: International Journal of Flexible Manufacturing Systems
Authors: ,
Keywords: production: FMS
Abstract:

Although extensive research has been conducted to solve design and operational problems of automated manufacturing systems, many of the problems still remain unsolved. This article investigates the scheduling problems of flexible manufacturing systems (FMSs). Specifically, the relative performances of machine and automated guided vehicle (AGV) scheduling rules are analyzed against various due-date criteria. First, the relevant literature is briefly reviewed, and then the rules are tested under different experimental conditions by using a simulation model of an FMS. The sensitivity to AGV workload, buffer capacity, and processing-time distribution is also investigated to assess the robustness of the scheduling rules.

Reviews

Required fields are marked *. Your email address will not be published.