Article ID: | iaor1994961 |
Country: | South Korea |
Volume: | 18 |
Issue: | 2 |
Start Page Number: | 105 |
End Page Number: | 130 |
Publication Date: | Aug 1993 |
Journal: | Journal of the Korean ORMS Society |
Authors: | Kim Seung-Nam |
Keywords: | material handling |
This study deals with finding a schedule for the moment of a material handling device (elevator) in a manufacturing plant. Two different algorithms (Traveling Salesman Technique and Greedy Algorithm) are used in the scheduling of the elevators using a simulation technique to determine the proper method of scheduling the elevator movement. Based on the simulation analysis, the paper found that the Greedy algorithm serves better than the algorithm based on Traveling Salesman technique for scheduling the movement of a material handling device in the manufacturing plant.