Article ID: | iaor19941076 |
Country: | South Korea |
Volume: | 18 |
Issue: | 2 |
Start Page Number: | 23 |
End Page Number: | 43 |
Publication Date: | Aug 1993 |
Journal: | Journal of the Korean ORMS Society |
Authors: | Shin Dong-Ho, Kim Chung-Young |
Keywords: | fuzzy sets |
This paper employs fuzzy variables instead of deterministic variables for job times in a project network. A fuzzy variable has its value restricted by a possibility distribution. This paper utilizes the triangular possibility distribution which has three estimated times. That is normal, reasonable, and crash job times. This paper develops a fuzzy