Scheduling repairs at Texas Instruments

Scheduling repairs at Texas Instruments

0.00 Avg rating0 Votes
Article ID: iaor1994514
Country: United States
Volume: 23
Issue: 4
Start Page Number: 68
End Page Number: 74
Publication Date: Jul 1993
Journal: Interfaces
Authors: , ,
Keywords: scheduling
Abstract:

The authors developed a single-shift model at Texas Instruments’ Cypress plant to schedule repairs of electronic assemblies. The model considers such shop-floor issues as technician capabilities and part preferences. While providing satisfactory results, the model has also found immediate acceptance on the shop floor, as it does not block out the human element-the supervisors.