Preventive maintenance scheduling of power generating units

Preventive maintenance scheduling of power generating units

0.00 Avg rating0 Votes
Article ID: iaor19932262
Country: Switzerland
Volume: 41
Issue: 1/4
Start Page Number: 185
End Page Number: 206
Publication Date: May 1993
Journal: Annals of Operations Research
Authors:
Keywords: maintenance, repair & replacement
Abstract:

The problem of preventive maintenance planning of electric power generating units can be formulated as a mixed-integer linear optimization problem. An extension of the model is presented to deal with more realistic assumptions about utilization of power resource. The authors propose a heuristic iterative exchange procedure to solve these problems. They introduce two methods to prevent jamming situations outside the feasible domain or at a local optimum. The first method is a recursive exchange procedure called multiple exchanges method and the second relies on Lagrangian relaxation. Furthermore, the authors compare these procedures with a tabu search.

Reviews

Required fields are marked *. Your email address will not be published.