Flexible final-assembly sequencing method for a JIT manufacturing environment

Flexible final-assembly sequencing method for a JIT manufacturing environment

0.00 Avg rating0 Votes
Article ID: iaor19932210
Country: United States
Volume: 31
Issue: 5
Start Page Number: 1189
End Page Number: 1199
Publication Date: May 1993
Journal: International Journal of Production Research
Authors: ,
Keywords: production: JIT
Abstract:

Uniquely, this new method-in a two-fold manner-improves both the supplier lines’ autonomy and the flexibility of the final assembly line. Consequently, suppliers can independently determine their output rates and thus change their workload pattern according to their needs and priorities. The final-assembly line gains flexibility which in return allows combination of these individual output rates in a way that a satisfactory assembly sequence is found. Moreover, this flexibility can help to avoid expensive final-assembly-line stoppages in case of sudden part supply disruptions. The sequencing method, which can easily be implemented into an existing just-in-time system, is mathematically formulated and the algorithm is depicted in a flow chart. A numerical example is given and computational results indicate the effectiveness of the method.

Reviews

Required fields are marked *. Your email address will not be published.