Article ID: | iaor19932201 |
Country: | United States |
Volume: | 31 |
Issue: | 4 |
Start Page Number: | 923 |
End Page Number: | 932 |
Publication Date: | Apr 1993 |
Journal: | International Journal of Production Research |
Authors: | Lasserre J.B., Dauzere-Peres S. |
The authors propose a modified version of the Adams et al. shifting bottleneck (SB) procedure for job-shop scheduling. By modifying Carlier’s algorithm extensively used in the SB procedure, they eliminate some drawbacks. Computational results are reported with good performances, particularly on the classical 10-10 and 5-20 problems.