A modified shifting bottleneck procedure for job-shop scheduling

A modified shifting bottleneck procedure for job-shop scheduling

0.00 Avg rating0 Votes
Article ID: iaor19932201
Country: United States
Volume: 31
Issue: 4
Start Page Number: 923
End Page Number: 932
Publication Date: Apr 1993
Journal: International Journal of Production Research
Authors: ,
Abstract:

The authors propose a modified version of the Adams et al. shifting bottleneck (SB) procedure for job-shop scheduling. By modifying Carlier’s algorithm extensively used in the SB procedure, they eliminate some drawbacks. Computational results are reported with good performances, particularly on the classical 10-10 and 5-20 problems.

Reviews

Required fields are marked *. Your email address will not be published.