Journal: Journal of Applied Sciences

Found 4 papers in total
Minimizing the maximum lateness on a two machine flowshop with batch processors
2004,
This paper considers the following problem: n jobs need to be processed on two...
Minimizing the range of lateness on a single machine with the workpieces processed in batches
2003,
There are n workpieces to be processed at time zero. The length of time needed for...
Optimal inventory control in enterprise
2002,
This article describes how to decide reasonable stocks in the enterprise inventory...
An algorithm for makespan scheduling for hybrid production in dynamic environment
2002,
To solve the problem of the optimal production time scheduling for a class of hybrid...
Papers per page: