Dimitri Golenko-Ginzburg
Information about the author Dimitri Golenko-Ginzburg will soon be added to the site.
Found
12 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Optimal booking of machines in a virtual job-shop with stochastic processing times to minimize total machine rental and job tardiness costs
2008
We treat a virtual job-shop problem of sequencing n jobs on m unique machines. Each...
High performance heuristic algorithm for controlling stochastic network projects
1998
An activity-on-arc network project of PERT type with random activity durations is...
A heuristic for network project scheduling with random activity durations depending on the resource allocation
1998
This paper presents a heuristic for resource-constrained network project scheduling. A...
Stochastic network project scheduling with non-consumable limited resources
1997
This paper presents a newly developed resource constrained scheduling model for a PERT...
Using ‘look ahead’ techniques in job-shop scheduling with random operations
1997
We consider a job-shop scheduling problem with n jobs (orders) and m machines. Each...
Hierarchical decision-making model for planning and controlling stochastic projects
1996
The authors will consider a three-level decision-making model for controlling...
A multilevel decision-making system with multiple resources for controlling cotton harvesting
1996
A number of the present recent papers have demonstrated the advantage of using...
On-line control model for cost-simulation network projects
1996
This paper presents a newly developed hierarchical control model for several PERT type...
On-line production control using the EVPI approach
1993
This paper deals with the on-line control of a dynamic production system by...
A two-level decision-making model for controlling stochastic projects
1993
The paper considers projects with a high level of uncertainty comprising activities of...
Using permutation space in job-shop scheduling
1992
The space of permutations of {1,..., mn} is mapped onto the space of feasible...
Feeding parts to an assembly line by several production units
1991
The problem of production control with disturbances for processing assembly-line is...