Ravi S S

S S Ravi

Information about the author S S Ravi will soon be added to the site.
Found 2 papers in total
Efficient Construction of Minimum Makespan Schedules for Tasks with a Fixed Number of Distinct Execution Times
2001
This paper addresses scheduling problems for tasks with release and execution times....
Approximation Algorithms for Degree‐Constrained Minimum‐Cost Network‐Design Problems
2001
We study network‐design problems with two different design objectives: the...
Papers per page: