Lin B M T

B M T Lin

Information about the author B M T Lin will soon be added to the site.
Found 2 papers in total
Two‐stage assembly‐type flowshop batch scheduling problem subject to a fixed job sequence
2012
This paper discusses a two‐stage assembly‐type flowshop scheduling...
Resource‐constrained flowshop scheduling with separate resource recycling operations
2012
This paper considers the relocation problem arising from public re‐development...
Papers per page: