Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
S.S. Panwalkar
Information about the author S.S. Panwalkar will soon be added to the site.
Found
5 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Common due window size and location determination in a single machine scheduling problem
1998
We consider a single machine static and deterministic scheduling problem in which jobs...
Single-machine sequencing with controllable processing times
1992
The authors consider a static single-machine sequencing problem in which job...
Single stage minimum absolute lateness problem with a common due date on non-identical machines
1993
In this paper the authors consider scheduling n single operation jobs with a common...
The lessons of flowshop scheduling research
1992
This paper reviews the flowshop-sequencing research since 1954 that has been devoted...
Scheduling of a two-machine flowshop with travel time between machines
1991
The paper considers the classical two-machine flowshop sequencing problem with the...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers