Brgy Reinhard

Reinhard Brgy

Information about the author Reinhard Brgy will soon be added to the site.
Found 3 papers in total
A neighborhood for complex job shop scheduling problems with regular objectives
2017
Due to the limited applicability in practice of the classical job shop scheduling...
Optimal job insertion in the no‐wait job shop
2013
The no‐wait job shop (NWJS) considered here is a version of the job shop...
The flexible blocking job shop with transfer and set‐up times
2011
The Flexible Blocking Job Shop (FBJS) considered here is a job shop scheduling problem...
Papers per page: