Minimizing the completion time of a project under resource constraints and feeding precedence relations: an exact algorithm
2012
In this paper we study an extension of the Resource‐Constrained Project...
An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
2012
In this paper we propose an exact algorithm for the Resource Constrained Project...
Scheduling models for air traffic control in terminal areas
2006
We propose a job-shop scheduling model with sequence dependent set-up times and...
Combinatorial aspects of the sensor location problem
2006
In this paper we address the Sensor Location Problem, that is the location of the...
A network based model for traffic sensor location with implications on origin/destination matrix estimates
2001
In this paper, we define and solve the sensor location problem (SLP), that is, we look...
Dynamic programming strategies for the traveling salesman problem with time window and precedence constraints
1997
The Traveling Salesman Problem with Time Window and Precedence Constraints (TSP-TWPC)...
Minimizing makespan in a multimode multiprocessor shop scheduling problem
1999
We study the problem of multimode scheduling tasks on dedicated processors, with the...
Flow shop no-wait scheduling with sequence dependent setup times and release dates
1999
We consider the problem of scheduling no-wait jobs, with release dates and sequence...
Minimizing total completion time subject to release dates and sequence-dependent processing times
1999
We consider the problem of scheduling jobs with release dates and sequence-dependent...
An exact algorithm for the resource-constrained Project Scheduling Problem based on a new mathematical formulation
1998
In this paper we consider the Project Scheduling Problem with resource constraints,...
A heuristic procedure for the crew rostering problem
1992
This paper deals with the problem of planning work schedules in a given time horizon...
Exact and heuristic procedures for the Traveling Salesman Problem with Precedence Constraints, based on dynamic programming
1994
The Traveling Salesman Problem with Precedence Constraints is to find an hamiltonian...
Perspectives of high speed rail transport in short-medium period
1991
In this paper an analytic method to evaluate technical and economic conditions of...
Scheduling tasks with sequence-dependent processing times
1988
In this article the authors consider the problem of minimizing the maximum completion...