Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
J.N.D. Gupta
Information about the author J.N.D. Gupta will soon be added to the site.
Found
14 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Improving preventive maintenance scheduling in semiconductor fabrication facilities
2006
The complexity of modern semiconductor manufacturing processes and the need for...
Minimizing flow time in a flow-line manufacturing cell with family setup times
2006
This paper considers the problem of scheduling part families and jobs within each part...
A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times
2006
This paper considers the permutation flowshop scheduling problem with...
Operational planning and control of semiconductor wafer production
2006
Due to increased competition, semiconductor manufacturing has received considerable...
A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
2004
Makespan minimization in permutation flow-shop scheduling is an operations research...
Comparative evaluation of MILP flowshop models
2005
This paper investigates the performance of two families of mixed-integer linear...
Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
2005
This paper considers the problem of scheduling a given set of precedence constraint...
Insights into two solution procedures for the single machine tardiness problem
2002
This paper explores the well-known modified due date (MDD) rule for minimizing total...
Part dispatching and machine loading in flexible manufacturing systems using central queues
1999
This paper describes a dispatching approach for FMSs where all parts are stored in a...
Two-stage no-wait scheduling models with setup and removal times separated
1997
This paper studies two models of two-stage processing with no-wait in process. The...
A flowshop scheduling problem with two operations per job
1997
This paper considers a special case of the flowshop scheduling problem where each job...
Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
1997
This paper considers a non-preemptive two-stage hybrid flow shop problem in which the...
A savings index heuristic algorithm for flowshop scheduling with sequence dependent set-up times
1995
This paper considers the permutation flowshop scheduling problem with significant...
Flowshop scheduling with set-up, processing and removal times separated
1991
Algorithms are developed for finding an optimal or near-optimal permutation schedule...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers