Oulamara Ammar

Ammar Oulamara

Information about the author Ammar Oulamara will soon be added to the site.
Found 6 papers in total
Scheduling the two‐machine open shop problem under resource constraints for setting the jobs
2013
This paper addresses the problem of open shop scheduling on two machines with...
Total completion time in a two-machine flowshop with deteriorating tasks
2007
This paper deals with two-machine flowshop problems with deteriorating tasks, i.e....
Makespan minimization in a no-wait flow shop problem with two batching machines
2007
This paper deals with the problem of task scheduling in a no-wait flowshop with two...
Permutation flowshop scheduling problems with maximal and minimal time lags
2006
In this paper, we study permutation flowshop problems with minimal and/or maximal time...
Optimal testing and repairing a failed series system
2006
We consider a series repairable system that includes n components and assume that it...
Papers per page: