Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Fariborz Jolai
Information about the author Fariborz Jolai will soon be added to the site.
Found
13 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Developing scenario-based robust optimisation approaches for the reverse logistics network design problem under uncertain environments
2015
In the last decade, economic benefits and environmental legislation have imposed...
Reliable forward-reverse logistics network design under partial and complete facility disruptions
2015
Although disruption risks may occur with a low probability in a supply chain network,...
A new multi-objective model for supplier selection
2015
In an order allocation model, selected evaluation criteria in most of the available...
Revisiting a fuzzy rough economic order quantity model for deteriorating items considering quantity discount and prepayment
2013
This study revisits a fuzzy rough economic order quantity (EOQ) model for...
An integrated fuzzy DEA‐fuzzy AHP approach: a new model for ranking decision‐making units
2013
The data envelopment analysis (DEA) model is a mathematical programming...
A model for classification of intermediate measures and evaluating the performance of chain and its members
2013
Data envelopment analysis (DEA) is a suitable tool for evaluating supply...
A Simulated Annealing algorithm for a mixed model assembly U‐line balancing type‐I problem considering human efficiency and Just‐In‐Time approach
2013
This research deals with balancing a mixed‐model U‐line in a...
A fuzzy based threshold policy for a single server retrial queue with vacations
2012
In this paper we deal with a single server retrial queue with vacations. The server...
An M/M/c queue model for hub covering location problem
2011
The hub location problem appears in a variety of applications including airline...
Exact algorithm for bi-objective 0–1 knapsack problem
2007
In this paper, we propose a new procedure based on linear mathematical programming...
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept
2007
This paper presents a newly developed resource-constrained project scheduling method...
Genetic algorithm for bi-criteria single machine scheduling problem of minimizing maximum earliness and number of tardy jobs
2007
Today's importance of on time deliveries according to JIT concept makes managers to...
Minimizing number of tardy jobs on a batch processing machine with incompatible job families
2005
In this paper we consider the problem of minimizing number of tardy jobs on a single...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers