Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
K.P. Anagnostopoulos
Information about the author K.P. Anagnostopoulos will soon be added to the site.
Found
3 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
An analytic hierarchy process model for construction contractor prequalification
2006
Given that contractor plays a critical role in any construction project, contractor...
Time–cost trade off in critical path method networks by simulated annealing
2001
In this paper a simulated annealing algorithm for time–cost trade off in CPM...
A fast algorithm for time compression in project scheduling
2002
An effective procedure for time–cost trade off in Critical Path Method (CPM)...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers