Yoon Suk-Hun

Suk-Hun Yoon

Information about the author Suk-Hun Yoon will soon be added to the site.
Found 4 papers in total
Minimizing maximum completion time in a proportionate flow shop with one machine of different speed
2007
A flow shop with identical machines is called a proportionate flow shop. In this...
Maximizing the weighted number of just-in-time jobs in flow shop scheduling
2007
In this paper we consider the maximization of the weighted number of just-in-time jobs...
Single machine scheduling problems with resource dependent release times
2007
We consider two single machine scheduling problems with resource dependent release...
Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
2002
Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots...
Papers per page: