Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Fawaz S. Al-Anzi
Information about the author Fawaz S. Al-Anzi will soon be added to the site.
Found
7 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
The three-machine flowshop scheduling problem to minimise maximum lateness with separate setup times
2007
We address the three-machine flowshop scheduling problem to minimise maximum lateness,...
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
2006
The assembly flowshop scheduling problem has been addressed recently in the...
Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm
2006
Many dominance relations have been established in the literature for scheduling...
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
2006
In this paper we address the two-stage assembly flowshop scheduling problem with...
Scheduling multi-stage parallel-processor services to minimize average response time
2006
The problem of scheduling on a multi-stage parallel-processor architecture in computer...
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times
2006
In this paper, we address the three-machine flowshop scheduling problem. Setup times...
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
2002
The multimedia data objects scheduling problem for WWW applications is modeled using...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers