Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Seyed M.R. Iravani
Information about the author Seyed M.R. Iravani will soon be added to the site.
Found
12 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Optimal production and rationing decisions in supply chains with information sharing
2007
This paper considers a two-echelon capacitated supply chain with two non-identical...
Operations systems with discretionary task completion
2007
Most performance evaluation models in the operations management literature implicitly...
Call-center labor cross-training: It’s a small world after all
2007
It is well known that flexibility can be created in manufacturing and service...
A produce-to-stock system with advance demand information and secondary customers
2007
We consider a manufacturer (i.e., a capacitated supplier) that produces to stock and...
A diagnostic tree for improving production line performance
2007
Improving performance of production systems is a critical but often unstructured...
Serial agile production systems with automation
2005
To gain insights into the design and control of manufacturing cells with automation,...
Production control policies in supply chains with selective-information sharing
2005
We consider a supply chain consisting of one manufacturer (capacitated supplier) and...
Structural flexibility: a new perspective on the design of manufacturing and service operations
2005
In this paper, we present a new perspective on flexibility in manufacturing and...
Optimal dynamic assignment of a flexible worker on an open production line with specialists
2006
This paper models and analyzes serial production lines with specialists at each...
When does the cμ rule apply to finite-population queueing systems?
2005
We consider optimal scheduling of the server in a finite-population queueing system...
Operations and shipment scheduling of a batch on a flexible machine
2003
We consider processing and shipment scheduling of a batch of size M jobs on a flexible...
A production/inventory system subject to failure with limited repair capacity
2000
We consider a production/inventory system consisting of M machines and K ( K ⩽ M )...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers