Integration of finished goods batch delivery into production scheduling via total tardiness minimization
2007
This study examined together machine scheduling and finished-product batch delivery....
Optimization models for the machine scheduling problem with a single flexible maintenance activity
2006
The majority of machine scheduling literature assumes that machines are available at...
Integer programming models for the re-entrant shop scheduling problems
2006
A re-entrant shop describes a manufacturing environment in which a machine can process...
A comparative study of schedule-generation procedures for the reentrant shops scheduling problem
2004
Most production scheduling-related research assumes that a job visits certain machines...
Mixed binary integer programming formulations for the reentrant job shop scheduling problem
2005
This paper describes the development of mixed binary integer programming (BIP)...
Minimizing tardiness in a two-machine flow-shop
2002
The two-machine flow-shop scheduling problem with the objective of minimizing total...
A heuristic approach for single-machine scheduling with due dates and class setups
2001
The single-machine sequence-independent class setup scheduling problem is examined in...