Semi on-line scheduling problem for maximizing the minimum machine completion time on m identical machines
2005
In this paper, a semi on-line version on m identical machines M1, M2,…,Mm...
Minimizing the range of order lateness with multiple job classes
2006
This paper considers a single machine scheduling problem with m customer orders and...
A hybrid two-stage flowshop scheduling problem
2007
This paper considers a batch scheduling problem in a two-stage hybrid flowshop that...
Minimizing total completion time of jobs on a flexible two machine flowshop
2005
This paper considers the following scheduling problem on a flowshop composed of two...
Scheduling jobs for a common due window to minimize weighted sum of earliness and tardiness penalties
2005
This paper studies a single machine scheduling problem in which all jobs have a common...
Minimizing the maximum lateness on a two machine flowshop with batch processors
2004
This paper considers the following problem: n jobs need to be processed on two...
Minimizing total completion time of orders with multiple job classes
2003
This paper considers the following sequencing problem: n jobs coming from m different...
Minimizing the range of lateness on a single machine with the workpieces processed in batches
2003
There are n workpieces to be processed at time zero. The length of time needed for...
Construction of efficient point set of 1//Tmax scheduling corresponding to controllable due dates
2002
This paper considers the sequencing problem of 1//Tmax with controllable due dates....
Minimizing the maximum deviation of job completion time from their due dates based on a general mode
2002
For a general scheduling problem of minimizing the maximum deviation of job completion...
A scheduling problem with earliness reward and tardiness penalty
2002
This paper considers such a sequencing problem which comes from the relationship...
Scheduling problems in a flowshop composed of two flexible machines
2001
This paper studies the scheduling problems in a flowshop composed of two flexible...
A sequencing problem in loading and unloading goods
2000
This paper considers the relationship between ship-owner and harbour in loading and...
An earliness and tardiness problem in single machine scheduling with a common due window
2000
This paper considers the following scheduling problem: (P):n jobs demand to be...