Neppalli Venkata R.

Venkata R. Neppalli

Information about the author Venkata R. Neppalli will soon be added to the site.
Found 1 papers in total
Minimizing total flow time in a two-machine flowshop problem with minimum makespan
2001
This paper considers the two-machine flowshop scheduling problem where it is desired...
Papers per page: