Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Pius J. Egbelu
Information about the author Pius J. Egbelu will soon be added to the site.
Found
16 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
An algorithm for minimizing weighted earliness penalty in assembly job shops
2006
This paper addresses the problem of minimizing the weighted earliness penalty in...
Algorithm for minimizing weighted earliness penalty in single-machine problem
2005
In this paper, the problem of minimizing the weighted earliness penalty in a...
Integrated manufacturing planning for an automated guided vehicle-based flexible manufacturing system
1999
This research aims at developing a manufacturing planning methodology for an AGV-based...
Scheduling in a production environment with multiple process plans per job
1999
Traditional job shop scheduling problems generally assume that there is a single...
Quadratic assignment problem with adaptable material handling devices
2000
The traditional quadratic assignment problem assumes handling costs between two...
A framework for the selection of idle vehicle home locations in an automated guided vehicle system
2000
In the study of automated guided vehicles systems (AGVS), one assumption often made in...
Relative pre-positioning of storage/retrieval machines in automated storage/retrieval systems to minimize maximum system response time
1997
In this paper, the problem of pre-positioning a storage/retrieval (S/R) machine in an...
Relative pre-positioning of storage/retrieval machines in automated storage/retrieval system to minimize expected system response time
1997
This paper is focused on the control problem of determining the dwell point of an idle...
Integration of operation routing and economic production quantity decisions in batch manufacturing systems
1996
Models for the determination of economic production quantity (EPQ) are always...
Positioning of automated guided vehicles in a loop layout to improve response time
1993
One of the control decisions in the operation of an Automated Guided Vehicle (AGV)...
Establishment of economic production rate, production batch size, and production sequence in manufacturing systems with flexible routeing
1993
Through automation, manufacturing systems today are being built with increased...
Reduction of manufacturing lead-time through selection of machining rate and unit handling size
1991
When parts are on the shop floor and in manufacture, they are either waiting for or...
Framework for dynamic positioning of storage/retrieval machines in an automated storage/retrieval system
1991
A methodology is presented based on linear programming formulation and which minimizes...
Scheduling for Just-in-Time manufacturing
1989
The concept of Just-In-Time manufacturing has several attractive features and...
Machining and material flow system design for minimum cost production
1990
In many manufacturing organizations, batch production is an everyday occurrence....
Operation routeing with lot sizing consideration in a manufacturing system
1990
Process planning and inventory control are important manufacturing functions; proper...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers