Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
C. Hicks
Information about the author C. Hicks will soon be added to the site.
Found
9 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Dynamic scheduling for complex engineer-to-order products
2007
The current paper considers dynamic production scheduling for manufacturing systems...
The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure
2004
In this paper, the development of a genetic algorithms based scheduling tool that...
A genetic algorithm tool for designing manufacturing facilities in the capital goods industry
2004
The layout of manufacturing facilities has a large impact on operational...
Product due date assignment for complex assemblies
2002
A method is described to assign product due dates for multistage assemblies with...
Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products
2002
A Genetic Algorithm-based Scheduling Tool has been developed for the scheduling of...
Applying designed experiments to optimize the performance of genetic algorithms used for scheduling complex products in the capital goods industry
2001
Conventional optimization approaches, such as Linear Programming, Dynamic Programming...
Setting planned job release times in stochastic assembly systems with resource constraints
2001
This paper considers a stochastic assembly system operating on a make-to-order basis...
Stage due date planning for multistage assembly systems
2001
Coordinating due dates of operations throughout all stages of manufacturing and...
Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach
2000
This paper describes the exploration of manufacturing planning and control issues in...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers