Bard J.F.

J.F. Bard

Information about the author J.F. Bard will soon be added to the site.
Found 14 papers in total
Disruption management for resource-constrained project scheduling
2005
In this paper, we study the problem of how to react when an ongoing project is...
Algorithms for parallel machine scheduling: a case study of the tracking and data relay satellite system
2003
This paper presents two algorithms for scheduling a set of jobs with multiple...
A branch-and-cut procedure for the vehicle routing problem with time windows
2002
This paper addresses the problem of finding the minimum number of vehicles required to...
A branch and cut algorithm for the VRP with satellite facilities
1998
An important aspect of the vehicle routing problem (VRP) that has been largely...
Balancing user preferences for aircraft schedule recovery during irregular operations
2000
In this paper, the irregular operations problem is approached for the first time in a...
A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times
1999
This paper presents a branch-and-bound enumeration scheme for the makespan...
Decomposition approach to the inventory routing problem with satellite facilities
1998
This paper presents a comprehensive decomposition scheme for solving the inventory...
An enhanced TSP-based heuristic for makespan minimization in a flow shop with setup times
1999
This paper presents an enhanced heuristic for minimizing the makespan of the flow shop...
Single-machine scheduling with flow time and earliness penalties
1993
This paper considers the problem of scheduling n jobs on a single machine to minimize...
An analysis of a rail car unloading area for a consumer products manufacturer
1997
This paper reports on the results of an effort to design and analyse the rail car...
A comparison of the Analytic Hierarchy Process with multiattribute utility-theory-A case-study
1992
This paper presents the results of a study in which two prominent multicriteria...
Sequencing mixed-model assembly lines to level parts usage and minimize line length
1994
The problem of sequencing units on a mixed-model assembly line can be viewed with...
Determining the number of kanbans in a multiproduct multistage production system
1991
Significant reductions in setup and lead times reported by the Japanese have led...
Production planning with variable demand
1990
This paper presents an expanded version of the dynamic inventory model in which...