Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Youngshin Park
Information about the author Youngshin Park will soon be added to the site.
Found
5 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Performance evaluation of re-entrant manufacturing system with production loss using mean value analysis
2006
This paper proposes an approximation method based on mean value analysis (MVA)...
Mean value analysis of re-entrant line with batch machines and multi-class jobs
2002
We propose an approximate approach for estimating the performance measures of the...
Scheduling jobs on parallel machines applying neural network and heuristic rules
2000
In this paper, we investigate the problem of scheduling jobs on identical parallel...
Scheduling jobs on parallel machines applying neural network and heuristic rules
2000
In this paper, we investigate the problem of scheduling jobs on identical parallel...
Mean value analysis of re-entrant lines with batch machines processing multiclass jobs
2000
We are concerned with estimating the average performance of a re-entrant line with...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers