Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Jae-Gyun Kim
Information about the author Jae-Gyun Kim will soon be added to the site.
Found
4 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Machining route selection with subcontracting using genetic algorithm
2000
This paper addresses a problem of machining route selection in multi-stage process...
A heuristic for parallel machine scheduling with due dates and ready times
2000
In this paper, we consider an n-job, non-preemptive and identical parallel machine...
A heuristic for parallel machine scheduling depending on job characteristics
2000
In the real world, situations that some jobs need be processed only on certain limited...
A genetic algorithm for manufacturing cell design based on operation sequence
1998
A cell design model based on operation sequence is proposed for maximizing the total...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers