Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Robert Pellerin
Information about the author Robert Pellerin will soon be added to the site.
Found
5 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system
2013
This paper deals with the problem of the joint determination of the optimal lot sizing...
Production control and replenishment strategy with multiple suppliers
2011
This paper considers the joint supplier selection, replenishment and manufacturing...
Production control and replenishment strategy with multiple suppliers
2011
This paper considers the joint supplier selection, replenishment and manufacturing...
Optimisation of the control policy for a stochastic remanufacturing system with an unreliable replacement parts supply
2009
We consider the control of a stochastic manufacturing system executing capital assets...
Bombardier turned to simulation to validate the CF-18 maintenance program
1997
The Canadair Defence Systems Division (DSD) is responsible for making all major...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers