Elmaghraby Salah E.

Salah E. Elmaghraby

Information about the author Salah E. Elmaghraby will soon be added to the site.
Found 18 papers in total
On the fallacy of averages in project risk management
2005
Managers recognize the presence of uncertainty in the estimates of the various...
On the optimal release time of jobs with random processing times, with extensions to other criteria
2001
We treat the problem of the optimal release time of a set of n jobs en masse to...
Chance-constrained programming in activity networks: A critical evaluation
2001
We review the chance-constrained programming (CCP) model for event realization in...
On computing the distribution function of the sum of independent random variables
2001
We present an efficient approach to the determination of the convolution of random...
An optimal assembly mode of multi-type printed circuit boards
1999
We deal with the problem of assembling several types of PCBs on a machine with...
On criticality and sensitivity in activity networks
2000
A review of the issues related to activity criticality and the sensitivity of the mean...
On the sensitivity of project variability to activity mean duration
1999
Traditionally the ‘importance’ of an activity in the PERT model of...
Call admission control schemes and asynchronous transfer mode network topological design
1998
Call admission control criteria are not only important for call admission control...
A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan
1998
We treat a problem of scheduling n jobs on a three stages hybrid flowshop of...
Optimal procedures for the discrete time/cost trade-off problem in project networks
1996
We describe two algorithms, based on dynamic programming logic, for optimally solving...
Activity nets: A guided tour through some recent developments
1995
The first papers on activity nets (under the names of the CPM and PERT) appeared in...
An approach to the modeling and analysis of software production processes
1995
This paper proposes an approach to the analysis and design of software production...
The scheduling of activities to maximize the net present value of projects
1990
The authors review and critique the approaches offered for the resolution of the...
Manufacturing capacity and its measurement: A critical evaluation
1991
The report reviews and analyzes the concept of productive capacity, identifies four...
Quality assurance and stage dynamics in multi-stage manufacturing. Part II
1990
This is the second in a two-part report on control engineering considerations in...
Quality assurance and stage dynamics in multi-stage manufacturing
1990
This is the first in a two-part report on control engineering considerations in...
On heuristics and their performance evaluation for dynamic lot sizing
1989
The worst case performance ratios (WCPRs) of several heuristics that may be used as...
The knapsack problem with generalized upper bounds
1989
A particular production planning problem gives rise to a knapsack problem with...
Papers per page: